BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//jEvents 2.0 for Joomla//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:STANDARD
DTSTART:20241109T080000
RDATE:20250330T020000
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:Europe/London GMT
END:STANDARD
BEGIN:STANDARD
DTSTART:20251026T010000
RDATE:20260329T020000
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:Europe/London GMT
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250330T020000
RDATE:20251026T010000
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:Europe/London BST
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:7019ef856fbb389065f89ba95d67485e
CATEGORIES:Events
CREATED:20250828T093158
SUMMARY:Temporary Road Closure - Preshute Lane (part)
DESCRIPTION:https://one.network/?tm=GB145006668 (https://one.network/?tm=GB145006668)\n
  \nPreshute Lane (Part), Marlborough; from its junction with Treacle Bolly 
 for a distance of approximately 56m in a westerly direction.\nTo enable: Wa
 les &amp; West Utilities to carry out a disconnection of gas service.\nAlte
 rnative route: via Preshute Lane (unaffected length) – Bridge Street – Bath
  Road and vice versa.\nThe closure and diversion route will be clearly indi
 cated by traffic signs.\nThis Order will come into operation on 10 November
  2025 and the closure will be required between the hours of 08:00 and 23:59
  for 4 days. It is anticipated that the works will take the stated duration
  to complete depending upon weather conditions. Access will be maintained f
 or residents and businesses where possible, although delays are likely due 
 to the nature of the works. The Order will have a maximum duration of 18 mo
 nths.\nFor further information please contact Wales &amp; West Utilities on
  02920278989.\n
X-ALT-DESC;FMTTYPE=text/html:<p><a href="https://one.network/?tm=GB145006668">https://one.network/?tm=GB
 145006668</a></p><p>&nbsp;</p><p>Preshute Lane (Part), Marlborough; from it
 s junction with Treacle Bolly for a distance of approximately 56m in a west
 erly direction.<br />To enable: Wales &amp; West Utilities to carry out a d
 isconnection of gas service.<br />Alternative route: via Preshute Lane (una
 ffected length) – Bridge Street – Bath Road and vice versa.<br />The closur
 e and diversion route will be clearly indicated by traffic signs.<br />This
  Order will come into operation on 10 November 2025 and the closure will be
  required between the hours of 08:00 and 23:59 for 4 days. It is anticipate
 d that the works will take the stated duration to complete depending upon w
 eather conditions. Access will be maintained for residents and businesses w
 here possible, although delays are likely due to the nature of the works. T
 he Order will have a maximum duration of 18 months.<br />For further inform
 ation please contact Wales &amp; West Utilities on 02920278989.</p>